Bowling Green: Improve and highlight the limestone facade
Cork Road: Develope the two triangular flower beds at the Ten Arch Bridge turnoff
Hanging baskets on Main Street: Prepare, plant and install baskets on Main St
Riverbank Walk: Sponsor and install two benches and litter bins